Author: Hamed Changizi
Bandarabbas overhaul 2015 – zone 71, 75, 79
Performed PWHT in Bandarabbas refinery, overhaul Area zone 71, 75 and 79 on within 3000 inches. Decamber 2015
Post heat on vessel of salafchegan gas station
Dia: 64 inch Length: 8 meter Weight: 40 ton