Advanced NDT in Mosul
PAUT, TOFD and PWHT on 3 Spherical tanks in Mosul
Heat treatment and advanced NDT (PAUT and TOFD) on spherical tanks SP100, SP200, SP1100 in Mosul-Iraq that accomplished by Hamedsoft engineering company in 28 Jan 2021. Tank detailed as below:
- Dia : ~18,000 mm
- Maximum Thickness: 55mm
- PWHT Detail:
- Average heating rate: 65’C/Hh
- Holding temperature: 599 ~ 649 ‘C
- Average cooling rate: 68’C/hr
PWHT in SFPC
Heat treatment on six spherical tanks in Salman-farsi petrochemical complex, Maahshahr-Iran that accomplished by Hamedsoft engineering company in 17 March …
PWHT, PAUT and TOFD on spherical tanks at Golgohar-Sirjan
Heat treatment on spherical tanks V501-A/B in Golgohar-Sirajan-Iran that accomplished by Hamedsoft engineering company in 14 Jan 2024. Tank detailed …
PWHT on Towers in Ahwaz
Accomplished PWHT on two towers in Ahwaz-Iran in Paysaz company. PWHT was done at 2023 February. Tanks Detail: Tower 3001, …
Phased Array On Spherical Tank – NGL3100
The project name: NGL3100Type of component: Spherical TankThk: 70mmClient: Oil industries engineering company (OIEC)Location : Dasht Abbas – Khuzestan – …
Phased Array ON Header box
Complete phased array on Header boxes in Shiraz. Hamedsoft Engineering group accomplished the Phased array project on header boxes in …
Stress relieve on spherical tank in Basrah
Heat treatment on spherical tank No. SP700 in Basra-Iraq that accomplished by Hamedsoft engineering company in 16 Oct 2020. Tank …
PWHT on khomeyn spherical tank
PWHT on spherical tank in Khomeyn-IRAN – Sep 2019 Heat treatment on spherical tank in Khomeyn, Markazi Iran that accomplished …
Heat treatment on storage tank in Zarand
PWHT on spherical tank in Zarand-IRAN – May 2018 Heat treatment on spherical tank in Zarand, Kerman Iran that accomplished …